50Hz Fire Extinguisher Pressure Testing Equipment , Emergency Lamp Fire Extinguisher Testing

Dongguan HOOHA Electrical Equipment Company Limited

50Hz Fire Extinguisher Pressure Testing Equipment , Emergency Lamp Fire Extinguisher Testing

Brand Name : HOOHA

Model Number : ZY6509

Certification : Refer to national standard GB17945-2010 fire emergency lighting and evacuation indicator system.

Place of Origin : China

MOQ : 1

Supply Ability : 10 sets/month

Delivery Time : 30 work days

Packaging Details : wood package

Price : USD 3000-80000/SET

Payment Terms : L/C, T/T, Western Union

color : white

adopt standard : GB17945-2010

Frequency : 50Hz

Output voltage : 100V ~ 250V continuously adjustable

warranty : 12 months

payment : T/T 100%

Contact Now

50Hz Fire Extinguisher Pressure Testing Equipment , Emergency Lamp Fire Extinguisher Testing

Scope of application:


This machine can be used for testing the national standard gb17945-2010 "fire emergency lighting and evacuation indicator system" and the built-in power supply fire emergency lighting and fire emergency lamp.

Meet the standard:


Refer to national standard GB17945-2010 fire emergency lighting and evacuation indicator system.

Main features:


The performance of the emergency lamp is a new experimental equipment developed by our company in reference to the national standard GB17945-2010 "fire emergency lighting and evacuation indicator system".

Components of the performance comprehensive tester for emergency lights:

The machine has three parts: computer automatic control center, electrical performance testing cabinet, optical performance tester. Through the computer automatic control technology, the complex experimental steps are centralized and reduced, and the time of human participation is reduced. With a powerful PLC controller, multi-group electrical performance test can be performed simultaneously, and the accuracy of the experiment is higher than that of manual measurement

Main parameters:


Ordinal number

Test items (gb17945-2010)

Requirements (lamps need to meet requirements)

Artificial detection before the experiment, appearance detection and so on

The lamp is in the main electric work state, check the manual self-check function;

In the emergency work condition of the lamps and lanterns, check and control the function of the emergency work.

The system should complete the self-check function manually

The first kind of experiment: electrical automatic experiment process project

1

7.5 voltage fluctuation experiment

Laboratory equipment

The experimental equipment shall meet the following conditions:

A) Output voltage: 100V ~ 250V continuously adjustable;

B) The frequency of communication is 50Hz.

7.5.3 Steps

The main power supply voltage of the sample is 242V and 187V respectively, and the working state is checked.

6.7 The system shall not be transferred to emergency status within the range of 85% ~ 110% of the main electric voltage. (187 v ~ 187 v)

2

7.6 switching voltage experiment

The experimental equipment shall meet the following conditions:

A) Output voltage: 100V ~ 250V continuously adjustable;

B) Frequency: 50Hz.

7.6.3 Experimental Procedure

Will sample the main electric cable according to the wiring diagram experiment device, make its are main power state, adjust experiment device, make the output voltage drops slowly, until the sample into the emergency state, record the output voltage; The output voltage is slowly rising until the sample is returned to the main current state and the output voltage is recorded. Adjust the main voltage of the lamp, make it slowly change in the range of 60% ~ 85% of the main electric voltage, observe and record the status of the lamp.

6.8 The main electric voltage of the system from the main electrical state to the emergency state shall be within 60% ~ 85% of the main electric voltage. The main electric voltage of the emergency response to the main electric state shall not be greater than 85% of the main electric voltage. System voltage in the main electrical voltage, either within the scope of 60% ~ 85% voltage should not occur status indicators and relay switch phenomenon such as beating for many times, not shiny type illuminant light blinking status should not occur.

3

7.2.2 electrify the lamps and lanterns of 24 h into the emergency state, check the starter fluorescent lighting lamps and lanterns of starting conditions (when necessary to fai and short circuit), and records the conversion time, start the time at the same time, until the batteries to its termination voltage, record the emergency work time.

The emergency switching time of the system should not be greater than 5s; The emergency switching time of the system used in high-risk areas should not be greater than 0.25 s.

The emergency working time of the system should not be less than 90min and not less than the emergency working time of the calibration of the lamp itself

4

7.2.2.5 Cut off the main power source of the built-in power supply or the sub-parent lamp, make it in a state of emergency, short-circuit and ground the main power cord, and check the working condition of the lamp.

The emergency status of the power supply and the sub - type lamps should not be affected by the short circuit and grounding of the main power supply line.

5

7.3.2.2 Transfer the sample to the emergency mode until the discharge protection is activated. At this moment, the terminal voltage of the battery is measured and the test sample is observed to restart, and then the static discharge current is measured.

The built-in power supply should be protected by discharge. The discharge termination voltage of the battery should not be less than 80% of the rated voltage of the battery, and the static discharge current should not be greater than 10-5c20a.

The second type of experiment: electrical control experiment

6

7.4 repeat conversion experiment

7.4.2 Experimental procedure

For 50 consecutive times, the sample will be kept for 1min by the main current state, then the emergency status will be kept for 20 seconds.

The system shall be able to complete the working state cycle of at least 50 "main electrical state 1min, emergency mode 20s, main current state 1 min".

7

7.2.2.13 Make the flashing signal lamp in the emergency condition, measure its shining frequency and light and non-lighting time ratio.

The shining frequency should be (1 + / 10%) Hz, and the lighting time ratio should be 4:1.

8

7.3 charge and discharge experiments

7.3.2.1 Connect the sample of the discharge termination to the main power supply, check the status of the charging indicator light, and measure the charging current after 24h. The charging current of the battery should be measured during the charging period.

6.4.2.1 Charging time should not be greater than 24h

9

7.7.2 Test of charge and discharge endurance

For 10 consecutive times, the sample will be fully charged and then transferred to emergency status until discharge protection is started. Record the first and final discharge time

6.9 System shall complete the charging and discharging process of 10 "full charge, discharge termination and full charge" cycle. The final discharge time shall not be less than 85% of the initial discharge time and shall meet the requirements of 6.3.2.

The third kind of experiment: the optical individual experiment project

Voltage stabilized power supply: 6KVA

Variable voltage power supply: 3KVA

The main test project: emergency conversion time, emergency work time, start over discharge protection, static discharge current, switching voltage test, the voltage fluctuation test, repeated transformation test, power transient test, shiny frequency, charge and discharge test, charge and discharge endurance test, etc.

Comply with GB 17945-2010 standard requirements

Technical services:


1. 20 years of brand commitment, patent quality, quality assurance, superior performance, excellent quality and full service;

2. 20 years of brand communication, professional team, professional technical and technical consultant, and the cooperation of various quality inspection institutes and schools;

3. Provide free service for the whole year, five quality control procedures, from material input to product handover control quality, ensure that the user is absolutely authentic;

4. The brand effect absolutely guarantees the quality of the products, and we provide high quality products with high quality products and the highest cost performance to ensure the testing data, and the guarantee of the company;

5. 18 professional technicals will solve any problem in your products. Professional after-sales team will provide you with the most beautiful service;

6. Free teaching research, equipment maintenance and free upgrade of equipment server;


Product Tags:

fire alarm testing equipment

      

fire detector tester

      
Best 50Hz Fire Extinguisher Pressure Testing Equipment , Emergency Lamp Fire Extinguisher Testing wholesale

50Hz Fire Extinguisher Pressure Testing Equipment , Emergency Lamp Fire Extinguisher Testing Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Dongguan HOOHA Electrical Equipment Company Limited
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0